AISI A2 Air-Hardening Cold-Work Tool Steel
Materials encyclopedia entry for A2.
Materials encyclopedia entry for A2.
Materials encyclopedia entry for A6.
Materials encyclopedia entry for A8.
Materials encyclopedia entry for ASP 2060.
A Vietnamese converter slitting 30 µm aluminium foil at 400 m/min was getting 5 days from a D2 slitter. The fix was a M2 HSS slitter with a ta-C coating. 18 days. The case study walks through the audit, the trial, the result, and the cost of welding.
A Polish converter cutting 12 µm BOPP film at 600 m/min was burning through 4 D2 slitters per week. The fix was a 2-week field audit, a steel-grade change, an edge-prep change, and a coolant-nozzle relocation. This case study walks through the diagnostic, the trial, and the result — a 6× service life improvement that paid back the entire project cost in 11 weeks.